Which of the following is the least used measure to allocate overhead? A. physical units produced B. labor hours worked C. sales units sold D. machine hours operated
Question
Which of the following is the least used measure to allocate overhead? A. physical units produced B. labor hours worked C. sales units sold D. machine hours operated
Solution
To determine the least used measure to allocate overhead, we need to compare the options provided: A. physical units produced, B. labor hours worked, C. sales units sold, and D. machine hours operated.
-
Start by analyzing option A, physical units produced. This measure allocates overhead based on the number of units produced. Consider whether this measure is commonly used in allocating overhead.
-
Move on to option B, labor hours worked. This measure allocates overhead based on the number of hours worked by employees. Evaluate whether this measure is frequently used in allocating overhead.
-
Consider option C, sales units sold. This measure allocates overhead based on the number of units sold. Assess whether this measure is commonly employed in allocating overhead.
-
Lastly, examine option D, machine hours operated. This measure allocates overhead based on the number of hours machines are in operation. Determine whether this measure is commonly utilized in allocating overhead.
After evaluating all the options, identify the measure that is the least used to allocate overhead.
Similar Questions
Which one of the following is the amount of factory overhead applied that exceeds the actual factory overhead cost?Question 1Select one:a.Over-applied overhead.b.Under-applied overhead.c.Factory overhead applied.d.Actual factory overhead.
If all you knew about a production system was that total daily output was 1000 units and the total labor necessary to produce the 1000 units was 1200 hours, and the total materials used were 1500 units, what kind of productivity measure could you use to compute productivity? Group of answer choicesOnly total measureOnly multifactor measureOnly partial measureBoth multifactor measure and total measureBoth partial measure and multifactor measure
2) In a process-costing system, the calculation of equivalent units is used for calculating:A) the dollar amount of ending inventoryB) the dollar amount of the cost of goods sold for the accounting periodC) the dollar cost of a particular jobD) Both A and B are correct.
If the best operating level of a piece of equipment is at a rate of 1000 units per hour and the actual output during an hour is 600 units, which of the following is the capacity cushion? Group of answer choices400 units per hour1000 units per hour167 percent60 percent600 units per hour
Management uses a(n) ______ budget to establish the standard overhead rate.Multiple choice question.flexiblefixedmaster
Upgrade your grade with Knowee