If the best operating level of a piece of equipment is at a rate of 1000 units per hour and the actual output during an hour is 600 units, which of the following is the capacity cushion? Group of answer choices400 units per hour1000 units per hour167 percent60 percent600 units per hour

Question

If the best operating level of a piece of equipment is at a rate of 1000 units per hour and the actual output during an hour is 600 units, which of the following is the capacity cushion? Group of answer choices400 units per hour1000 units per hour167 percent60 percent600 units per hour

🧐 Not the exact question you are looking for?Go ask a question

Solution

400 units per hour

Explanation:

The capacity cushion is the amount of reserve capacity a process uses to handle sudden increases in demand or temporary losses of production capacity. It measures the amount by which the maximum possible output rate exceeds the actual output rate.

In this case, the best operating level of the equipment is 1000 units per hour, and the actual output is 600 units per hour. Therefore, the capacity cushion is 1000 units per hour (maximum possible output) minus 600 units per hour (actual output), which equals 400 units per hour.

This problem has been solved

Similar Questions

Odell's Furniture has a manufacturing facility in Rigby, Idaho that has an effective capacity of 133 furniture pieces per day and produces 113 furniture pieces per day. Their design capacity is 140 units per day.What is the facility's efficiency rate? Write your answer as a percentage.Display your answer to two decimal places.   %What is the facility's utilization rate? Write your answer as a percentage.Display your answer to two decimal places.    %

Demand for an item is 12,000 units. Line capacity is 250 units per hour. How many productive hours are required on this line to meet demand?Multiple Choice35.550.065.548.0

The capacity utilisation rate is determined by the ratio of best operating level and capacity used.Group of answer choicesTrueFalse

Which of the following is the least used measure to allocate overhead? A. physical units produced B. labor hours worked C. sales units sold D. machine hours operated

Productivity is output per worker hour.Group of answer choicesTrueFalse