A CPM/PERT project network with probabilistic activity times includes an activity with a most likely time of 11 days, an optimistic time of 9 days, and a pessimistic time of 22 days. The variance of the activity in the problem above is (round your answer to 1 decimal place)

Question

A CPM/PERT project network with probabilistic activity times includes an activity with a most likely time of 11 days, an optimistic time of 9 days, and a pessimistic time of 22 days. The variance of the activity in the problem above is (round your answer to 1 decimal place)

🧐 Not the exact question you are looking for?Go ask a question

Solution

The variance of an activity in a CPM/PERT project network can be calculated using the formula:

Variance = ((Pessimistic time - Optimistic time) / 6)^2

Given in the problem: Pessimistic time = 22 days Optimistic time = 9 days

Substituting these values into the formula:

Variance = ((22 - 9) / 6)^2 Variance = (13 / 6)^2 Variance = 2.17^2 Variance = 4.7 (rounded to 1 decimal place)

So, the variance of the activity is 4.7.

This problem has been solved

Similar Questions

A PERT/CPM activity has an optimistic time estimate of 5 days, a most likely time estimate of 10 days, and a pessimistic time estimate of 24 days. What is the expected time (in days) of this activity?Round answer to two decimal places.hint: formula is available in lecture notes

Time used in PERT for drawing the Network diagram is a.Optimistic timeb.Pessimistic timec.Most likely timed.Expected Time

If the most pessimistic and most optimistic estimates of the amount of time needed to complete an activity are 10 days and 4 days, respectively, the activity's variation is expected to bea.1b.2c.3d.4

CPM model will be used only when the duration of the activities are________ .a.Certainb.Uncertainc.Optimistic timed.Pessimistic time

hile solving a network flow problem by PERT, which of the followingtype of time will be used to measure the length of Critical Path? Pessimistic Expected Most Likely Optimistic

1/3

Upgrade your grade with Knowee

Get personalized homework help. Review tough concepts in more detail, or go deeper into your topic by exploring other relevant questions.