An analyst has timed a metal-cutting task for 50 cycles. The average time per cycle was 11.9 minutes, and the standard deviation was 1.32 minutes for a worker with a performance rating of 130 percent. Assume an allowance of 17 percent of task time. Calculate the standard time for this task. (Do not round intermediate calculations. Round the final answer to 2 decimal places.)

Question

An analyst has timed a metal-cutting task for 50 cycles. The average time per cycle was 11.9 minutes, and the standard deviation was 1.32 minutes for a worker with a performance rating of 130 percent. Assume an allowance of 17 percent of task time. Calculate the standard time for this task. (Do not round intermediate calculations. Round the final answer to 2 decimal places.)

🧐 Not the exact question you are looking for?Go ask a question

Solution 1

To calculate the standard time for this task, we need to follow these steps:

  1. First, we need to calculate the Normal Time (NT). Normal Time is the average time per cycle multiplied by the performance rating. The performance rating needs to be in decimal form, so 130 percent is 1.3.

    NT = Average time per cycle * Performance rating NT = 11.9 minutes * 1.3 NT = 15.47 minutes

  2. Next, we calculate the Allowance Time (AT). This is the Normal Time multiplied by the allowance percentage (in decimal form).

    AT = Normal Time * Allowance percentage AT = 15.47 minutes * 0.17 AT = 2.63 minutes

  3. Finally, we add the Normal Time and the Allowance Time to get the Standard Time (ST).

    ST = NT + AT ST = 15.47 minutes + 2.63 minutes ST = 18.10 minutes

So, the standard time for this task is 18.10 minutes.

This problem has been solved

Solution 2

To calculate the standard time for this task, we need to follow these steps:

  1. First, we need to calculate the Normal Time (NT). Normal Time is the average time per cycle divided by the worker's performance rating. The performance rating is expressed as a decimal, so 130 percent is 1.3.

    NT = Average Time per Cycle / Performance Rating NT = 11.9 minutes / 1.3 NT = 9.15 minutes

  2. Next, we calculate the Allowance Time (AT). This is the Normal Time multiplied by the allowance percentage (expressed as a decimal).

    AT = Normal Time * Allowance Percentage AT = 9.15 minutes * 0.17 AT = 1.56 minutes

  3. Finally, we add the Normal Time and the Allowance Time to get the Standard Time (ST).

    ST = Normal Time + Allowance Time ST = 9.15 minutes + 1.56 minutes ST = 10.71 minutes

So, the standard time for this task is 10.71 minutes.

This problem has been solved

Similar Questions

A task was timed for 60 cycles. It took an average of 1.32 minutes per cycle. The performance rating was 100 percent, and workday allowance is 6 percent. Determine each of the following. (Do not round intermediate calculations. Round the final answers to 2 decimal places.)        a.  Observed time minutes   b.  Normal time minutes   c.  Standard time minut

Assuming an allowance factor of 15 percent of workday, calculate the standard time for this task. (Round the final answers to 2 decimal places.) Element Performance Rating  ST1 90%           minutes  2 80            minutes  3 134            minutes  4 108            minutes

How many observations should a stopwatch time-study analyst plan for in a task that has a standard deviation of 1.47 minutes per piece if the goal is to estimate the mean time per piece to within 0.4 minute with a confidence of 99.0 percent? (Round the intermediate calculations to 2 decimal places. Round the final answer to the next whole number.)

A job had an observed time of 5 minutes, a performance rating of 0.80, and an allowance proportion of 10 percent of job time. Twenty-five cycles were timed. Normal time for the job in minutes is:Multiple Choice4.54.03.64.4

How many work cycles should be timed to estimate the average cycle time to within 1 percent of the sample mean with a confidence of 95.0 percent if a pilot study yielded these times (in minutes): 4.9, 4.1, 4.3, 4.1, 4.3, and 4.6? (Round the final answer to the nearest whole number.)

1/3

Upgrade your grade with Knowee

Get personalized homework help. Review tough concepts in more detail, or go deeper into your topic by exploring other relevant questions.