A job had an observed time of 5 minutes, a performance rating of 0.80, and an allowance proportion of 10 percent of job time. Twenty-five cycles were timed. Normal time for the job in minutes is:Multiple Choice4.54.03.64.4
Question
A job had an observed time of 5 minutes, a performance rating of 0.80, and an allowance proportion of 10 percent of job time. Twenty-five cycles were timed. Normal time for the job in minutes is:Multiple Choice4.54.03.64.4
Solution
To calculate the normal time for the job, you need to multiply the observed time by the performance rating.
Here are the steps:
-
Multiply the observed time (5 minutes) by the performance rating (0.80).
Calculation: 5 minutes * 0.80 = 4 minutes
So, the normal time for the job is 4 minutes. Therefore, the answer is 4.0.
Similar Questions
A task was timed for 60 cycles. It took an average of 1.32 minutes per cycle. The performance rating was 100 percent, and workday allowance is 6 percent. Determine each of the following. (Do not round intermediate calculations. Round the final answers to 2 decimal places.) a. Observed time minutes b. Normal time minutes c. Standard time minut
Assuming an allowance factor of 15 percent of workday, calculate the standard time for this task. (Round the final answers to 2 decimal places.) Element Performance Rating ST1 90% minutes 2 80 minutes 3 134 minutes 4 108 minutes
An analyst has timed a metal-cutting task for 50 cycles. The average time per cycle was 10.5 minutes, and the standard deviation was 1.15 minutes for a worker with a performance rating of 122 percent. Assume an allowance of 14 percent of task time. Calculate the standard time for this task. (Do not round intermediate calculations. Round the final answer to 2 decimal places.)
Watches are being produced on an assembly line consisting of 20 workers. The line produces 4 watches per minute.In this scenario, what is the cycle time (i.e. the average time between completion of a watch)? Group of answer choices20 seconds4 minutes4 minutes15 seconds30 seconds
Calculate the takt time for a service system that is intended to perform a standardized service. The system will have a total work time of 460 minutes per day, two 12-minute breaks, and an hour for lunch. The service system must process 95 jobs a day. (Round the final answer to 2 decimal places.)Takt time minutes per job