Watches are being produced on an assembly line consisting of 20 workers. The line produces 4 watches per minute.In this scenario, what is the cycle time (i.e. the average time between completion of a watch)? Group of answer choices20 seconds4 minutes4 minutes15 seconds30 seconds
Question
Watches are being produced on an assembly line consisting of 20 workers. The line produces 4 watches per minute.In this scenario, what is the cycle time (i.e. the average time between completion of a watch)? Group of answer choices20 seconds4 minutes4 minutes15 seconds30 seconds
Solution
The cycle time is the total time taken to produce one product. In this case, the assembly line produces 4 watches per minute.
To find the cycle time, you divide the total time by the number of products produced.
Here's the step-by-step calculation:
- We know that there are 60 seconds in a minute.
- The line produces 4 watches per minute, so we divide 60 seconds by 4 watches.
- 60 seconds / 4 watches = 15 seconds per watch.
So, the cycle time or the average time between the completion of a watch is 15 seconds.
Similar Questions
A task was timed for 60 cycles. It took an average of 1.32 minutes per cycle. The performance rating was 100 percent, and workday allowance is 6 percent. Determine each of the following. (Do not round intermediate calculations. Round the final answers to 2 decimal places.) a. Observed time minutes b. Normal time minutes c. Standard time minut
An analyst has timed a metal-cutting task for 50 cycles. The average time per cycle was 10.5 minutes, and the standard deviation was 1.15 minutes for a worker with a performance rating of 122 percent. Assume an allowance of 14 percent of task time. Calculate the standard time for this task. (Do not round intermediate calculations. Round the final answer to 2 decimal places.)
An agriculture equipment manufacturer has a sub-assembly production line where eight steps or tasks must be performed (outlined in the table below with all relevant information). Daily demand (required output rate) is 54 units and there are 960 minutes available each day to meet this production quota.Task Req'd Time (in minutes) Predecessor A 9 NoneB 5 AC 5 BD 7 BE 13 CF 3 CG 7 D, E, FH 3 G What is the total time (in minutes) for this production line? What is the takt time (in minutes) for this production line? (Round your answer to a one decimal place.) What is the theoretical minimum number of workstations required for this production line? (Round up your answer to the nearest whole number.) Given your task assignments to workstations, what is the actual number of workstations required? What is the cycle time (in minutes) for this production line? What is the overall efficiency for this production line? (Write your answer as a percentage, and display your answer to two decimal places.) %
45 men can complete a work in 16 days. Six days after they started working, 30 more men joined them. How many days will they now take to complete the remaining work
Twenty men were employed to do some work in a certain time. It was found that, after one-third of the scheduled time, only one-quarter of the total work was completed. How many more men should now be employed to complete the work in 3/4th of the originally scheduled time
Upgrade your grade with Knowee
Get personalized homework help. Review tough concepts in more detail, or go deeper into your topic by exploring other relevant questions.