A boy lifts a 1 kg block by 1 m. The work done by the boy is: (g = 9.8 metre per second squared)

Question

A boy lifts a 1 kg block by 1 m. The work done by the boy is: (g = 9.8 metre per second squared)

🧐 Not the exact question you are looking for?Go ask a question

Solution

The work done by the boy can be calculated using the formula for work, which is:

Work = Force x Distance

In this case, the force is the weight of the block, which can be calculated using the formula:

Weight = Mass x Gravity

Given that the mass of the block is 1 kg and the acceleration due to gravity is 9.8 m/s², the weight of the block is:

Weight = 1 kg x 9.8 m/s² = 9.8 N

Therefore, the work done by the boy in lifting the block by 1 m is:

Work = 9.8 N x 1 m = 9.8 Joules

This problem has been solved

Similar Questions

A 5 kg object is lifted 10 meters vertically upward. What is the work done against gravity? (Assume g=9.8m/s²)Select one:a.490 Jb.100 Jc.50 Jd.980 J

A body of mass 'm' kg is lifted by a man to height 'h' in 30 sec another man lifts same body to same height in 60 sec, then find out ratio of their work done  :-1 : 22 : 11 : 11 : 4

A lift that weighs 300N moves a man with a weight of 950N upwards by 12m. How much work is done to move the lift this height?

How much work W is done in lifting a 30-kg sandbag to a height of 9 m? (Use 9.8 m/s2 for g. Round your answer to the nearest integer.)W =

A weightlifter lifts a weight of 500N from the ground over her head, a distance of 1.8m. How much work has been done to move the weight?

1/3

Upgrade your grade with Knowee

Get personalized homework help. Review tough concepts in more detail, or go deeper into your topic by exploring other relevant questions.