Uriah owns a café, and they sell lasagna for a lunch time meal. It costs them $30 in raw materials with $25.20 in fixed costs and $4.80 in variable costs per pan to create their lasagna. Uriah used to get 24 pieces per pan, but they decided to reduce the size of the pieces and now can get 40 pieces per pan. They charge $6 per piece. What are their unit costs for the pan with 24 pieces and the pan with 40 pieces?Select answer from the options below$1.67 and $0.34$1.25 and $0.67$1.52 and $0.76$1.25 and $0.75
Question
Uriah owns a café, and they sell lasagna for a lunch time meal. It costs them 25.20 in fixed costs and 6 per piece. What are their unit costs for the pan with 24 pieces and the pan with 40 pieces?Select answer from the options below0.340.670.760.75
Solution 1
To calculate the unit cost, we need to add the fixed costs and variable costs, then divide by the number of units produced.
For the pan with 24 pieces: Total cost = Raw materials + Fixed costs + Variable costs Total cost = 25.20 + 60 Unit cost = Total cost / number of units Unit cost = 2.50
For the pan with 40 pieces: Total cost = Raw materials + Fixed costs + Variable costs Total cost = 25.20 + 60 Unit cost = Total cost / number of units Unit cost = 1.50
So, none of the options provided are correct. The unit costs for the pan with 24 pieces and the pan with 40 pieces are 1.50 respectively.
Solution 2
To calculate the unit cost, we need to add the fixed costs and variable costs, then divide by the number of units (pieces of lasagna).
For the pan with 24 pieces: The total cost is 25.20 (fixed costs) + 60. So, the unit cost is 2.50 per piece.
For the pan with 40 pieces: The total cost is the same, 60 / 40 = $1.50 per piece.
However, none of the provided options match these calculations. There might be a mistake in the question or the provided options.
Similar Questions
The total cost for a full hotel pan of breakfast frittata is $22.80. What is the portion cost if the pan is cut 4 x 6?
Multiple Choice QuestionDirect materials are $15 per unit; direct labor is $7 per unit and variable overhead costs are $2 per unit. If total product costs are $27, what are fixed costs per unit?Multiple choice question.$30$24$3
Multiple Choice QuestionBrother Company uses variable costing. Their direct materials are $8, direct labor is $6 and total overhead is $5 of which $3 is variable. What is Brother Company's total unit cost?Multiple choice question.$19$17$14$13
A company is holding a workshop for their employees and the administrator has been asked to buy sandwiches for the attendees. The manager has allowed the administrator to spend 60% of the total catering budget for the workshop. The total catering budget is USD$800. The price per sandwich is USD$5 but the company has a 20% discount coupon.How many sandwiches can the administrator buy within the specified budget? 80 sandwiches 90 sandwiches 100 sandwiches 110 sandwiches 120 sandwiches
The total cost of making shahi paneer is divided into three parts paneer, gravy and fuel in the ratio 2:2:1 . A chef sells it at Rs 260 per plate and makes a profit of 30% . If the prices of paneer and fuel increase by 20% and 10% respectively and the chef does not want to change the selling price of the shahi paneer , what will be his new profit % ?Question 24Answera.18 2/11%b.16 2/11%c.20%d.25%