The manufacturing process for producing a widget has five steps and each step in the process takes one day. What is the average number of days needed to manufacture each widget using a pipelined process to produce 10 widgets?

Question

The manufacturing process for producing a widget has five steps and each step in the process takes one day. What is the average number of days needed to manufacture each widget using a pipelined process to produce 10 widgets?

🧐 Not the exact question you are looking for?Go ask a question

Solution

In a pipelined manufacturing process, once the first step of the process is completed for the first widget, it can immediately move on to the second step, while the first step begins for the second widget. This means that after the initial "ramp up" of the pipeline, a new widget can be completed at the end of each day.

So, for the first widget, it will take 5 days (one day for each step). However, for the next 9 widgets, since the process is pipelined, each one will be completed at the end of each subsequent day.

Therefore, to produce 10 widgets, it will take 5 days for the first widget + 9 days for the next 9 widgets = 14 days total.

To find the average number of days needed to manufacture each widget, you would divide the total number of days by the number of widgets. So, 14 days / 10 widgets = 1.4 days per widget on average.

This problem has been solved

Similar Questions

If it takes 5 machines 5 minutes to make 5 widgets, how long would it take 100 machines to make 100 widgets?5 minutes20 minutes100 minutes1 minute

A machine can make 30 widgets in 8 minutes. At this constant rate, how many widgets will 4 such machines make in   hours?

Working at the same constant rate, three identical machines can produce a total of  widgets per minute. At this rate, how many widgets could 8 such machines produce in 5 minutes?

9 pipes are required to fill a tank in 4 hours. How long will it take if 12 pipes of the same type are used?Choices:-

An agriculture equipment manufacturer has a sub-assembly production line where eight steps or tasks must be performed (outlined in the table below with all relevant information). Daily demand (required output rate) is 54 units and there are 960 minutes available each day to meet this production quota.Task     Req'd Time (in minutes)     Predecessor A 9 NoneB 5 AC 5 BD 7 BE 13 CF 3 CG 7 D, E, FH 3 G What is the total time (in minutes) for this production line?   What is the takt time (in minutes) for this production line? (Round your answer to a one decimal place.)   What is the theoretical minimum number of workstations required for this production line? (Round up your answer to the nearest whole number.)   Given your task assignments to workstations, what is the actual number of workstations required?   What is the cycle time (in minutes) for this production line?   What is the overall efficiency for this production line? (Write your answer as a percentage, and display your answer to two decimal places.)   %

1/2

Upgrade your grade with Knowee

Get personalized homework help. Review tough concepts in more detail, or go deeper into your topic by exploring other relevant questions.